| Status: | runing | 
| Registration Date: | 92-91 | 
			master
		 Kerman Province Gas Co.
 Kerman Province Gas Co.Social status
		 Kerman
 Kerman contract type
		 PC
 PC main contractor
		 sayal gostar company
 sayal gostar companydescription
		6 and 10-inch gas pipeline Haji Abad - Arzuiyeh of Tupac receiving station Haji Abad existing gas pipeline begins and In a way station between the milk and Vakil Abad in the km 44, 389 + 24 main line sizes 6 inch split and until the Vakil Abad valve station 06 + 949 km in length continues Finally, 10-inch gas pipeline Arzuiyeh receiving station in km 51+ 290.15 Tupac Arzuiyeh ends.
 
						 
						-924154eb99.jpg)
-661b53ac5b.jpg)